ABOUT US

Mehmet Nuri GÖÇEN

Founder of our Company

We kindly present our sincere compliments to Dear Mr. Mehmet Nuri GÖÇEN, who laid the foundations of Gocay Construction Company, transferred his insight, farsightedness and entrepreneur spirit to future generations, and whom we are deeply grateful for the recent status of our company.

CHAIRMAN'S MESSAGE


When founding GÖÇAY in 1979 our priority target was to grow into a company which had proven itself in the construction sector with its achievements and serving our country.

I see with great happiness and honor that we, together as the GÖÇAY family, have successfully achieved the target we set at the beginning.

We finalized all our commitments within the shortest achievable times, with low costs and at the highest quality. We contributed to the economy of our country.

In tandem with it, we grew steadily and, more importantly, with “confidence”.

Today we have much greater goals.

We aim attain the position of a worldwide company within the globalization which is the irresistible concept of the new millennium; our modern understanding of production in compliance with international norms, our machine park that can meet all current requirements and our qualified employee; each specialized in their own fields.

I would like to express my gratitude to investor companies which have provided us with the opportunity to execute their projects, our business, partners and our staff which forms the great GÖÇAY family.

Yours sincerely,

Mustafa GÖÇEN
Chairman

Göçay Construction Contracting & Trade Co. Inc. established in Aydın in 1979, is a construction company with works and achievements at world standards in parallel with the globalization and development after 80s.

Expertise subjects are so wide including big construction works such as highways, motorways, asphalt pavements, bridges, tunnels, airports, dams, ponds, irrigation, drinking water supply lines, wastewater treatment plants, tourism facilities, business centres, residential complexes and any kind of industrial, social and administrative facilities construction with the benefits of developed machine park and superior engineer accumulation.

In its all projects in tourism sector, Göçay Construction has always acted as investor, contractor and operator of the facilities, moreover Göçay Construction has been also involved in motorway and energy projects to be executed via B.O.T (Build - Operate - Transfer) model.

With its mission closely following global innovations and with a vision aiming at building the world of tomorrow, Göçay has been taking confident steps towards the future.

CONSTRUCTIONGÖÇAY-GÜRİŞ ORDINARY PARTNERSHIP

Göçay-Güriş Ordinary Partnership is currently performing the Construction of the Bursa Ring Road Motorway Yalova Junction - Turanköy Interchange Section (Km: 2+000-27+148), which is being carried on under the commitment of our company.

The Bursa Ring Road Motorway, which is a portion of the İstanbul-Bursa-Balıkesir-İzmir Motorway, is 42 km long, comprising 33 km of motorway and 9 km of access road. The motorway is designed to have 2x3 lanes, while the access road is designed to have 2x2 lanes.

İÇ İÇTAŞ -GÖÇAY JOINT VENTURE

IC İçtaş-Göçay Joint Venture is currently performing the Ağrı Plain Yazıcı Irrigation Construction work, which is being carried on under the commitment of our company.

NÖMAYG JOINT VENTURE

It was formed by Nurol-Özaltın-Makyol-Astaldi-Yüksel-Göçay in 2011 with the objective of executing the Gebze-Orhangazi-İzmir Motorway project via B.O.T (Build-Operate-Transfer) Model.

MAKYOL-GÖÇAY ORDINARY PARTNERSHIP

It was formed to construct 11 km of the motorway at the Gebze-Orhangazi section as part of the Gebze-Orhangazi-İzmir Motorway project.

BUILT-OPERATE-TRANSFER PROJECTSMOTORWAY INVESTMENT AND OPERATION INC.

Motorway Investment and Operation Inc. was founded with the participation of Nurol Construction and Trade Inc., Özaltın Construction Trade and Industry Inc., Makyol Construction Industry Tourism and Trade Inc., Astaldi S.p.A, Yüksel Construction Inc., and Göçay Construction Contracting and Trade Inc. in 2010. The company was found with the objective of executing the Gebze-Orhangazi-İzmir (İzmit Gulf Passage and Access Roads included) Motorway Project on Build-Operate-Transfer (BOT) model basis.

TOURISMGÖÇAY-ONUR TOURISM OPERATION INVESTMENT CONSTRUCTION TRANSPORTATION MINING AND TRADE INC.

Hilton Dalaman Sarıgerme Resort & SPA, which is located in Sarıgerme Tourism centre of Ortaca District of Muğla Province, was commissioned as a 5-star Hotel and Golf Facility with a capacity of 834 beds in July 2009. The facility is the first Resort Hotel of Hilton Hotels in Turkey. It was built on a site with an area of 1,500,000m2 and the Golf Facility is currently under construction.

GÖÇSAR TOURISM INVESTMENT INC.

Göçsar Tourism Inc. was founded in 1988. Since 1996, it has been running 4-star Marina Hotel with a capacity of 250 beds, which is located opposite the Kuşadası Yacht Port, owned by this company.

GÖÇTAŞ TOURISM RESTORATION AND INVESTMENT INC.

Göçtaş Inc. was founded in 2008 by Mr. Mustafa GÖÇEN with the objective of being engaged in tourism investments, operation and yacht tourism and it has been running 4-star Grida City Hotel with a capacity of 200 beds located downtown Antalya.

ENERGYDC HYDRO-POWER GENERATION INC.

DC Hydro-Power Generation Inc. was founded in 2008 with the participation of Göçay Construction Contracting and Trade Inc., Özdemir Construction Tourism Energy Industry and Trade Inc., Esat Energy Production and Trade Co. Inc., Vatech Hydro GMBH, Alstomhydro Austria GMBH, Voith Siemens Hydro Power Gen. GMBH & CO. KG, Pöyryenergy GMBH and Dolsar Engineering Ltd. with the objective of constructing the Doğanlı and Çukurca Dams, which are covered by the Bilateral Co-operation Agreement between Turkey and Austria, on Build-Operate-Transfer (BOT) model basis.

COMPLETED WORKS
NAME AND LOCATION OF WORKCLIENTCONTRACT DATECOMPLETION DATECONTRACT VALUE (US $)
HIGHWAY AND MOTORWAY CONSTRUCTIONS
Aggregate Preparation and Hauling Works for Base and Sub-base Courses of Roads Constructed in Various District of Turkey (Totally 2.000.000 m3)General Directorate of Highways/ Ankara31.10.198231.12.198410.979.906 $
Denizli-Acıpayam Highway (13th District Border) / DenizliGeneral Directorate of Highways (2nd Div.) / İzmir29.12.198318.08.19887.952.730 $
Aliağa-İzmir-Turgutlu-Torbalı Highway (1st Part) / İzmirGeneral Directorate of Highways/ Ankara04.05.198411.01.198945.031.329 $
Balıkesir-Akhisar Highway (2nd Part) / BalıkesirGeneral Directorate of Highways/ Ankara24.01.198514.09.198928.060.684 $
Çiğli-Cumaovası Highway (1st Part)/ İzmirGeneral Directorate of Highways (2nd Div.) / İzmir09.01.198915.05.19919.895.207 $
Çarşıbaşı-Trabzon-Araklı, Trabzon-Maçka Highway / TrabzonGeneral Directorate of Highways/ Ankara13.01.198825.12.199140.901.665 $
Bursa-Yalova Road Construction (Between Km:2.1+200-32+800) BursaGeneral Directorate of Highways 14th Regional Directorate / Bursa18.02.198410.02.19852.280.075 $
Gerede-Ankara and Ankara Ring Road ( 3B Part) Sub-base Works / AnkaraEnka-Bechtel Joint Venture/ Ankara08.01.199030.12.199115.104.217 $
Construction of Various Asphalt Pavement in Bornova and Karşıyaka/ İzmirİzmir Metropolitan Municipality/ İzmir21.07.199213.11.19954.914.725 $
Çiğli-Cumaovası Highway (2nd Part)/ İzmirGeneral Directorate of Highways/ Ankara28.09.199005.12.199623.287.706 $
Aydın-Sarayköy (Aydın-Nazilli-Horsunlu) Highway / AydınGeneral Directorate of Highways/ Ankara17.01.199125.12.199647.776.583 $
Asphalt pavement works / AydınAydın Metropolitan Municipality / Aydın07.09.199317.01.1994419.950 $
Construction of Various Asphalt Pavement in Yalova/ BursaYalova Municipality/Bursa19.09.199725.12.20067.351.973 $
Construction of Various Asphalt Pavement in Orhangazi/ BursaOrhangazi Municipality/ Bursa21.08.199830.12.20074.631.793 $
Gölcük 1st District (GK2) Roads / KocaeliGölcük Municipality / Kocaeli15.04.200314.11.20045.715.967 $
Construction of Private Asphalt Pavement/ BursaVarious Private Organisations/ Bursa03.05.199731.12.200921.768.792 $
Bursa-İnegöl-Bozüyük (1st Part) Highway / BursaGeneral Directorate of Highways/ Ankara05.04.200531.12.2008

10.878.117 $

Gemlik Ring Road Bituminous Hot Mixture Works / BursaGeneral Directorate of Highways (14th Div.) / Bursa28.04.201105.10.20112.253.850 $
Bursa-Yalova Highway / BursaGeneral Directorate of Highways/ Ankara26.12.199501.11.2011

57.390.560 $

 
(1) Bursa Ring Road Motorway Construction/ BursaGeneral Directorate of Highways/Ankara16.12.199826.2.2015241.215.113 $
(2) Gebze – Orhangazi Motorway Construction (Km:8+411-19+213) / İzmit - BursaNÖMAYG Joint Venture / Ankara22.11.201131.12.2015132.000.000 $
INFRASTRUCTURE CONSTRUCTION
Eli-Şahinali (B) Panel Earthmoving / AydınGeneral Directorate of Turkish Coal/ Ankara06.07.198209.12.19832.390.870 $
Tavas-Aydoğdu Irrigation Pond/ DenizliProvincial Directorate of Rural Services / Denizli13.07.198116.07.19841.454.566 $
The Diversion, Power and Access Tunnels of Gönen Dam / BalıkesirGeneral Directorate of State Hydraulic Works (25th Div.) / Balıkesir12.02.198223.11.19842.426.612 $
Yatağan-Tınaz-Bağkaya (A) Panel Earthmoving / MuğlaGeneral Directorate of Turkish Coal/ Ankara18.05.198513.09.19869.686.680 $
İzmir Atatürk Organised Industrial Zone Infrastructure Works / İzmirMinistry of Industry and Trade/ Ankara12.05.198615.11.198813.842.717 $
Soma Eynez (5) Panel Earthmoving / ManisaGeneral Directorate of Turkish Coal/ Ankara28.09.199214.08.199622.745.826 $
Ereğli (Konya) Sewerage Construction/ KonyaGeneral Directorate of Iller Bank/ Ankara17.09.199828.08.200617.494.240 $
Adıyaman Çamgazi Irrigation and Diversion Facilities Construction / AdıyamanGeneral Directorate of State Hydraulic Works/ Ankara08.01.199631.12.200970.849.084 $
SUPERSTRUCTURE CONSTRUCTION
Inter-city Bus Terminal/ AydınAydın Municipality/Aydın31.01.198026.08.19822.232,579 $
State Hydraulic Works Topçam Irrigation Management Plants (1st Part)/ AydınGeneral Directorate of State Hydraulic Works (21st Div.) / Aydın27.01.198428.12.19851.272.315 $
Buca Dormitory Complex (1500 students) / İzmirMinistry of Public Works and Settlement/ Ankara09.10.199028.02.19949.656,359 $
Housing, Trade and Cultural Complex/ ManisaManisa Municipality/ Manisa29.06.198725.06.19946.477,310 $
Efekent Housing Complex/ AydınEfekent Building Cooperation/ Aydın19.08.198705.11.199611.589,826 $
Torbalı Textile Complex / Torbalı-İzmirGöçay Textile Industry and Trade Inc./Ankara10.05.199730.04.19989.879,872 $
(3) Consag Business Center Wuppertal / GermanyConsag Generalbau GmbH/ Germany15.01.199730.06.199821.005.342 $
Çorlu International Airport / TekirdağGeneral Directorate of Railways, Harbours and Airports Construction/ Ankara01.12.199431.03.199958.920,567 $
TOURISM FACILITIES CONSTRUCTION
Pine Bay Holiday Resort Kuşadası/ AydınGöçtur Tourism Investment and Trade Inc./ İzmir01.03.198831.03.199226.368,736 $
Marina Hotel Kuşadası/ AydınGöçsar Tourism Construction Contracting and Trade Inc./ Aydın10.01.199401.04.199610.617,823 $
Pine Bay Beach Club Kuşadası/ AydınGöçtur Tourism Investment and Trade Inc./ İzmir13.08.200112.06.20023.447,624 $
Hilton Dalaman Sarıgerme Resort & SPA / MuğlaGöçay-Onur Tourism Operation Investment Transportation Mining and Trade Inc.06.06.200631.05.2009140.000.00 $
1 US $ = 2.9475 TL (04.01.2016)
(1) J.v. Is Formed By Göçay - Güriş Construction Companies.
(2) J.v. Is Formed By Göçay - Makyol Construction Companies.
(3) J.v. Is Formed By Göçay-Akfen-Summa
WORKS IN PROGRESS
NAME AND LOCATION OF WORKCLIENTCONTRACT DATACOMPLETION DATECONTRACT VALUE (US $)
HIGHWAY AND MOTORWAY CONSTRUCTIONS

(4) Ağri Plain Yazıcı Irrigation Construction / Ağrı
The irrigation and drainage network installations and construction of 25.861 ha. Land will be realized by joint-venture of Göçay and İçtaş. 119.500.000 cu.m of water will be derived per year from Cumaçay, Hanobaçayı, and Toprakkale basins to Yazıcı Dam Basin.

 

General Directore of DSİ (State Hydraulic Works) / Ankara26.01.199831.12.2017154.517.638 $
(5) Gebze - Orhangazi - İzmir (İzmit Gulf Passage and Access Roads included) MotorwayGeneral Directorate of Highways / Ankara15.03.201331.12.20196.536.810.614 $
Gebze - Orhangazi - İzmir (İzmit Gulf Passage and Access Roads Included) highway, Bursa-Susurluk section construction, construction works between KM:104+535 - 163+300 /BursaNÖMAYG Joint Venture / Ankara01.01.201531.12.2018350.000.000 $
Malatya Ringroad Motorway Construction
Total project length is 54 kms. The road has got 2x2 lines.
General Directorate of Highways / Ankara08.09.201617.11.201962.719.925 $
 1 US $ = 2.9475 TL (04.01.2016)
(4) Joint Venture is Formed by İçtaş - Göçay Construction Companies
(5) Executed By Nurol - Özaltın - Makyol - Astaldi - Göçay.
ANKARA CHAMBER OF COMMERCE (ATO)
ANKARA CHAMBER OF INDUSTRY (ASO)
THE UNION OF CHAMBERS AND COMMODITY EXCHANGES OF TURKEY (TOBB)
Mehmet Erdal EREN
Chairman of Turkish Contracting Services
TURKISH CONTRACTORS ASSOCIATION
Mehmet Erdal EREN
Chairman of the 28th, 29th and 30th Periods (2004-2001)
THE TURKISH EMPLOYERS' ASSOCIATION OF CONSTRUCTION INDUSTRIES (INTES)
Mustafa GÖÇEN
Member of the Higher Advisory Board
Mehmet GÖÇEN
Member of Young Directors of Group
ASPHALT CONTRACTORS ASSOCIATION (ASMÜD)
Mustafa GÖÇEN
Chairman of the 4th and 5th Periods (2002-2006)
FOREIGN ECONOMIC RELATIONS BOARD (DEİK)
Mehmet Erdal EREN
Member of the Board of Directors
TURKISH INDUSTRY AND BUSINESS ASSOCIATION (TUSIAD)
WORLD WATER COUNCIL (WWC)
TURKISH TOURISM INVESTORS ASSOCIATION (TYD)
Mustafa GÖÇEN
Member of the Board of Directors
Mehmet GÖÇEN
(Reserve) Member of the Audit Board
Young TYD Member