


| Client | : | Republic of Turkey, General Directorate of Highways |
|---|---|---|
| Date of Construction | : | 1991-1996 |
| Location | : | Aydın |
| Length | : | 73.5 Km. |
| Single Lane Highway | : | 44.65 Km. |
| 2x3 Divided Road | : | 28.85 Km. |
| Earthworks (Cut&Fill) | : | 1.515.000 m3 |
| Plant-mixed Base | : | 1.185.000 Tones |
| Bituminous Hot Mixture | : | 463.000 Tones |