CONSTRUCTION

Construction Works for LOT 3- Sagarejo - Badiauri Section from Km 35+500 to Km 52+540 of Tbilisi – Bakurtsikhe – Lagodekhi Highway (Kakheti Highway). GEORGIABACK
Client:Roads Department of Georgia under the Ministry of Regional Development and Infrastructure of Georgia
Construction year:10/02/2023 - On going 
Location:Sagarejo. GEORGIA
 Length of Highway:17,040 meter- 2 x 2 lanes and Total Length of Access Roads 28.140 meter – 2 x 1 lanes.
Earthworks (Excavation and Backfilling):3.000.000 m³ 
Wick Drain Works for Soil Improvement :2.587.000 m
Stone Column Works for Soil Improvement:46.685 m
Plant-mix Subbase and Base Course:360.074 m³ 
Asphalt  Base - Asphalt Surface Course::888.807 m²
Pile Works :11.164 m
RC Concrete Works:79.811 m³
Total RC Bridge Deck Area:5.503 m²
Total Length of Culverts:2.564 m