CONSTRUCTION

Gebze-Orhangazi-İzmir(Including Izmit Bay Passing and Linking Roads) Highway Project. Gebze – Orhangazi (Km:8+411-19+213) Section Highway ConstructionBACK
Client:NÖMAYG Joint Venture
Construction year:27/09/2010 - 31/12/2015
Location:Gebze-Orhangazi
Length:10.8 Km (2x3 Motorway)
Earthworks ( Excavation and Filling Works):10.593.000 m³
RC Concrete Works:70.000 m3
Pre-fabricated Beam:60.000 Tones
Viaduct:2 units

 Göçay - Makyol  JV. (%50 -%50) constructed The Project.