Client | : | General Directorate of State Hydraulic Works |
---|---|---|
Construction Year | : | 1998-2018 |
Location | : | Ağrı |
Scope of Work | : | Construction of 25.079 ha.piped irrigation network, 56.230 meter RC concrete main channel. 16.477 meter RC concrete diversion chanel (Right Side). 3350 meter tunnel. 662.410 meter HDPE , Steel , CTP piped network (Pipe dia from 100 mm to 1200 mm). 39 Filitration Station. 3 Regulator. |
IC İçtaş-Göçay JV (50%-50%) constructed The Project. |