Client | : | General Directorate of Iller Bank |
---|---|---|
Construction Year | : | 1998-2006 |
Location | : | Ereğli / Konya |
Scope of Work | : | Sewerage Network, Collector Lines, Manholes, Parcel Connections and Manholes, Partial Stormwater Channels. |
Annual Concrete Pipe Production | : | 50.000 mt. (Ø150-1200 mm.) |